4.0                DETAILS OF THE OUTLINE PLANNING APPLICATION

4.1             The application is in outline form with siting and means of access being the two matters for consideration.

4.2             Whilst the allocation for site EMP 1.8 covers some 5.8 hectares, this application does not include the western third of the allocated site. This is in separate ownership.

4.3             Accordingly the site area is some 4.41 8 hectares and the proposed commercial floorspace (excluding the MSA) is 8,482 sq m compared with the 1 7,500 sq m agreed at the Local Plan Inquiry.

4.4             The application covers two aspects. First the MSA. Outline planning permission (97/57199/001 refers) and reserved Matters Approval (02/57199/002 refers) has been given for this development. Whilst the general location of the MSA is restricted by the approved deceleration and acceleration lines to and from the A27(T) this application seeks to modify the approved layout. However the main design elements established under the reserved matters approval will be replicated in this amended scheme.

4.5             In addition the extant permission provides for a 40 bedroomed hotel wholly serving the westbound A27(T) traffic. As a result this permission provides little, if any, local tourism benefit to the Emsworth and Havant economy. Accordingly the size of the hotel has been double (to 80 bedrooms) and a secondary car park will be provided from the internal road network. As a result the hotel will also be able to serve the tourism needs of Emsworth.

4.6             To the west of the MSA a two-storied office courtyard development is envisaged. There would be 1 6 units providing a gross Bl (a) floorspace of 3840 sq m. The design of this courtyard would be modern and the courtyard itself would be a car-free area - having a landscaped central courtyard. Parking would be provided to the rear, and cycle parking would be provided at the entrances to the courtyard and the individual units.

4.7             The final part of the site will comprise an industrial estate in a mixed Bl(c) / B8 use, the general design of which would be similar to the recently constructed buildings on the SEEDA estate on

4.8             There will be a mix of building sizes ranging from 96 sq m up to 324 sq m. In total there would be some 4642 sq m gross Bl(c) / B8 floorspace.

4.9             The first part of the site does not form part of this application. Its shape is awkward due to the tapering nature of the site boundaries, the location of the high pressure gas main and the requirement for the access road to be aligned around the crown spread of the oak tree at the site entrance.

4.10        The initial Master Plan for the whole site envisaged a 'gateway' style three storied office building which could be let to a single user. However market research has indicated that the absence of a direct link to the A27(T) makes the site unattractive for such end users. A separate planning application for an alternative 'employment' use will be submitted on this parcel of land.

4.11        Landscaping of the site is a reserved matter. Along the southern boundary planting is restricted due to the presence of the railway and the gas main. As a result planting will be predominantly to the north of the spine road and then throughout the site and along the northern boundary, to supplement existing Highway Agency planting.

5.0                PLANNING CONSIDERATIONS

5.1             This part of the report analyses various development control aspects of the site in respect of the MSA; issues of noise and disturbance to residential properties to the south of the railway; the visual impact of the development of the site; and, the consideration of the use of resources. It also draws on the conclusions of the accompanying TAR, FRA, Ecological and Archaeological Reports.

RESIDENTIAL ENVIRONMENT

5.2             The site is bounded by the Havant to Chichester section of the A27(T) to the north and the south coast mainline railway between Havant and Emsworth to the south.

5.3             The A27(T) is elevated at the western end of the site where it passes over the railway line. From this point, for a distance of approximately 400 metres there is a substantial close-boarded wooden screen fence.

5.4             In my submissions the only residential properties that could be affected by a commercial development of the site are those dwellings west of the primary school on the north side of Selengar Avenue.

5.5             It is relevant to note that these properties back immediately onto the railway and look over to the A27(T).

5.6             There is no intention to develop the site with unneighbourly uses. The commercial allocation seeks Bl uses probably with a small element of B8, but in small units. There is no intention to accommodate distribution uses, due to the possible impact of HGVs on the local road network.

5.7             By the very definition of Bl they are uses which can be accommodated within a residential area without detriment to the amenity of that area by reason of noise, vibration, smell, fumes, smoke, soot, ash, dust or grit.

5.8             Concluding the matter of potential harm to amenities of the housing and educational uses to the south of the site, I am satisfied that they are already separated from the site by the railway. Moreover, the site access would be constructed parallel to that and thus the proposed employment buildings would be set some distance from them. In any event, the Council have powers at their disposal to ensure that any future occupiers do not emit sounds or smells that would be injurious to amenities.

5.9             I therefore submit that the residential amenity currently enjoyed by the properties facing onto the site will not be adversely affected by its development for commercial purposes.

 

LANDSCAPE IMPACT

5.10        The site is well screened from public views with the exception of views from the railway and from the A27(T) bridge over New Brighton Road. Any development of the site would incorporate substantial earth bunding and landscaping along the southern boundary. The northern boundary has a substantial Highway Agency planting belt ranging from 5-1 5 metres in depth. This planting is now projecting from the embankment above the fencing and will shortly provide an effective visual screen.

5.11        Within the site all linear features, such as hedges and watercourse would be retained and incorporated into the development. This will enable them to retain and enhance their important role as wildlife corridors. They would be supplemented with buffer strips on both sides.

5.12        In this regard it is material to note that the LPA have accepted that development on the site would have no adverse impacts on landscape [para 44 of their Response Proof - Housing - H4 - Housing Site Allocations] and that such a use is an effective use of an under-used parcel of land [page 119 of Special Planning and Development Committee Report - 1 9 September 2000].

5.13        Additionally landscaping would be undertaken where necessary to ensure that the site blends in with its surroundings and forms an integral part of Emsworth. The substantial planting undertaken by the DoT has become established and will shortly fully screen the site. This landscaping will be reinforced along the application site's northern boundary with additional native planting. Additionally the two existing strips of hedgerows that follow the watercourses would be retained to form natural breaks in the internal layout of the site.

5.14        In my view the construction of the A27(T), which is largely at a higher level than the surrounding land, has created a new feature in the urban form of Emsworth.

5.15        5.1 5 On this basis I consider that the A27(T) has negated the previous role of the railway in defining the limit of the urban form of this part of Emsworth. When standing within the site there are clear views of the housing and the primary school along Selengar Avenue. The presence of the railway is immaterial except on the occasion of a train passing. I therefore consider that commercial development of the site would fully integrate with the urban form of Emsworth.

5.16        I also consider that assessment of urban form is not solely a desktop exercise of examining maps. The issue of sustainability and integration with local services and transport is fundamental to ensuring that development can integrate with the urban form. As I have set out in section 3 above, I consider that this site is fully sustainable and is closely connected to the town centre, the recreation ground, local schools and other services and to the local public transport and pedestrian and cycle networks. The site will not be isolated.

5.17        I conclude on this issue that development of this unusual site would provide the only opportunity for a significant amount of commercial floorspace to be provided within Emsworth. It would therefore make a significant contribution to making Emsworth a sustainable town and reduce the significant level of out-commuting that currently occurs.

5.18        As the Inspector commented in the Local Plan report at 12.11.7:

"Although the land lies within the defined Strategic Gap in the adopted Local Plan, it was accepted by the Council as being a "rounding-off" of development up to the A27(T), whilst still retaining an adequate separation between Emsworth and Havant. I generally agree with that finding particularly as the dual carriageway traversing the Gap is a more prominent feature than the railway. However, rather than defining the edge of the Gap along the northern side of the road, I consider the southern boundary would be better, whereby it could incorporate the highway margin, which is quite broad in places. I also consider a planting screen along the site's northern boundary would help reinforce the edge of the Gap and screen any proposed buildings...."

 

RESOURCE USE

5.19        By using resources sustainably, we can avoid using resources which may run out, and avoid causing pollution which may harm the Borough for future generations. There are a number of objective criteria against which new developments can be judged, to assess whether they are using resources sustainably.

5.20        The BREEAM standard is considered to be the most appropriate for assessing developments in Havant Borough. It covers offices, homes (scheme known as Eco-Homes), industrial units, retail units and schools and assesses the development's performance against a range of criteria, and these buildings are rated on a scale of Pass, Good, Very Good or Excellent.

5.21        All development on the application site will be required to meet either the "Very Good" or "Excellent" standard, and at reserved matters stage an assessment will be submitted to demonstrate how this will be met. Higher standards will be encouraged.

5.22        A major contributor of climate change is the burning of fossil fuels resulting in increasing carbon dioxide emissions, which in turn is causing the Earth to warm. Producing energy from renewable sources will help to reduce this problem. The long term planning aim is carbon neutral development, and all new development on the site will be expected to minimise its carbon footprint. For this reason the owners' approach is to require all of the development to meet an increasing proportion of its own energy needs through on-site generation and use of energy from renewable sources.

5.23        The requirements are set in terms of a percentage of expected carbon index of a building as calculated by the SBEM (non-domestic) method. This method is that required by the Building Regulations and so will not put an additional burden on the designer(s) of the new buildings. Buildings will be required to use as little energy as possible and setting the target in this way will ensure that all economical efficiency savings are built into the design. This is because the renewable requirement will then be a percentage of a smaller overall figure. This in turn can then be met using a smaller and more economical renewable energy system.

5.24        Small scale renewable energy generation, including solar power, micro wind power, biomass and ground source heat pumps, will be encouraged by the developer to be built into the design process of all buildings. The developer will require a 25% proportion of the energy used in the operation of a development to be from on-site renewable sources.