| A - Path from Palmers Road to Subway | |
|
A1 - Replace small set of
steps with a ramp to improve access for disabled persons.
|
![]() |
|
Estimated cost£ 30,000
|
|
|
A2 - Provide lighting on the
path between the subway and Palmers Road car park to improve safety
|
![]() |
|
Estimated cost£ 5,000
|
|
|
A3 - Improve signage of car
park from North Street and A259
|
|
|
Estimated cost£ 10,000
|
|
| B - North Street Subway | |
|
B1 - Security mirrors to
give view of underpass
|
![]() |
|
Estimated cost£ 1,000
|
|
|
B2 - Handrails both sides of
ramp
|
|
|
Estimated cost£ 5,000
|
|
|
B3 - Anti-slip surface on
ramps
|
|
|
Estimated cost
£ 10,000
|
|
|
B4 - Light reflecting paint
in Subway .
|
![]() |
|
Estimated cost
£ 15,000
|
|
|
B5 - Public Art Panels in
the subway with possible theme of 'The Echo'
|
![]() |
|
Estimated cost
£ 6,000
|
|
|
B6 - Reduce gradient of
subway steps cost range
|
![]() |
|
Estimated cost
£100,000 - £150,000
|
|
| C - Crossing the Road | |
|
C1 - Improve crossing
refuges in North Street north and south of the roundabout.
|
|
|
Estimated cost
£ 20,000
|
|
| D - A259 between Millponds | |
|
D1 - Replace existing
lighting with lower level, ornamental columns, with warmer light, less
'trunk road' looking.
|
![]() |
|
Estimated cost
£ 60,000
|
|
|
D2 - Remove railings and
island at bus stop east of roundabout
|
![]() |
|
Estimated cost
£ 2,000
|
|
|
D3 - Replace existing
railings with more decorative style with a theme significant to Emsworth
|
![]() |
|
Estimated cost
£ 24,000
|
|
|
D4 - Information Board (as
at Bridgefoot Path)
|
![]() Information board at Bridge Foot Path |
|
Estimated cost
£ 6,000
|
|
|
D5 - Notice Board (as in The
Square)
|
|
|
Estimated cost
£ 5,000
|
|
|
D6 - Sculpture from
|
Suggested site for public art |
|
Estimated cost
£15,000
|
|
| E - Roundabout | |
|
E1 - De-clutter central
feature
|
|
|
Estimated cost
£ 1,000
|
|
|
E2- Raise central island
with chevrons built into the island
|
|
|
Estimated cost
£ 30,000
|
|
| F - Brook Meadow | |
|
F1 - Improve initial length
of footpath up to bridge
|
![]() |
|
Estimated cost
£ 2,000
|
|
|
F2 - Treat woodwork of
bridge and walkway
|
![]() |
|
Estimated cost
£ 1,000
|
|
|
F3 - Paint underpass with
light reflecting paint approx
|
![]() |
|
Estimated
cost £ 7,000
|
| Question
1 your top priorities |
| 1
is top priority |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| Question 2 your lowest
priorities |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |